HENRY STREET RAIL CROSSING WATERMAIN REPLACEMENT  Finn Valley

HENRY STREET RAIL CROSSING WATERMAIN REPLACEMENT

Finn Valley executed a comprehensive project involving the design, construction, commissioning, restoration,
establishment, and testing of a watermain relocation beneath the Henry Street ARTC railway crossing. The project
also included connecting a new DN250 PE100 watermain to existing watermains. Works were meticulously planned
to coincide with the ARTC’s October closedown period from 6:30 am on October 4, 2023, to 8:30 pm on October 6,
2023.
The scope encompassed:

  • Installation of a DN250 PN16 PE100 watermain.
  • Implementation of traffic management measures.
  • Testing and commissioning of the watermain.
  • Disposal of excess materials.
  • Compliance with construction drawings.
  • Restoration of the site upon completion.

Design considerations included auger bore and casing pipe installation, ensuring alignment with the ARTC closedown
schedule. Site signage and delineation were meticulously arranged to delineate work areas in accordance with the
‘Work Areas – October Possession – ARTC 202’ plan. Finn Valley collaborated closely with ARTC-provided resources,
including a Track Certifier, Protection Officer, Tamper, Geotechnical Engineer, Traffic Control for level Crossing
Closure, and Track Survey Monitoring. These parties conducted thorough checks of Finn Valley’s WHS plans to
mitigate risks associated with possession-related activities. All workers underwent ARTC site induction to ensure
awareness of relevant risks.

The ARTC works proceeded smoothly, meeting high standards and fulfilling Finn Valley’s expectations. All
documentation, including quality documentation, was promptly provided to the client upon completion of the works,
ensuring full compliance with project requirements and client satisfaction.